  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Shoring - Wikipedia

    en.wikipedia.org/wiki/Shoring

    Shoring is designed to prevent collapse where shielding is only designed to protect workers when collapses occur. Concrete-structure and stone-building shoring, in these cases also referred to as falsework , provides temporary support until the concrete becomes hard and achieves the desired strength to support loads.

  4. Falsework - Wikipedia

    en.wikipedia.org/wiki/Falsework

    Falsework includes temporary support structures for formwork used to mold concrete [1] in the construction of buildings, bridges, and elevated roadways. The British Standards of practice for falsework, BS 5975:2008, defines falsework as "Any temporary structure used to support a permanent structure while it is not self-supporting."

  5. List of construction trades - Wikipedia

    en.wikipedia.org/wiki/List_of_construction_trades

    Pipefitter (or steamfitter), a person who lays out, assembles, fabricates, maintains, and repairs large-sized piping systems capable of enabling high-pressure flow. [9] Plasterer, a tradesperson who works with plaster, such as forming a layer of plaster on an interior wall or plaster decorative moldings on ceilings or walls. [10]

  6. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    The traditional slab formwork technique consists of supports out of lumber or young tree trunks, that support rows of stringers assembled roughly 3 to 6 feet or 1 to 2 metres apart, depending on thickness of slab. Between these stringers, joists are positioned roughly 12 inches (30 cm) apart, upon which boards or plywood are placed. The ...

  7. Earthworks (engineering) - Wikipedia

    en.wikipedia.org/wiki/Earthworks_(engineering)

    Many software products use methods based on triangulated irregular networks (TINS) and triangular prism volume algorithms, however other calculation methods are in use based on rationalizing elevations into high density grids or cross-sections.

  8. Foundation (engineering) - Wikipedia

    en.wikipedia.org/wiki/Foundation_(engineering)

    Shallow foundations of a house versus the deep foundations of a skyscraper. Foundation with pipe fixtures coming through the sleeves. In engineering, a foundation is the element of a structure which connects it to the ground or more rarely, water (as with floating structures), transferring loads from the structure to the ground.

  9. Concrete leveling - Wikipedia

    en.wikipedia.org/wiki/Concrete_leveling

    In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.