Search results
Results from the WOW.Com Content Network
Wall studs are framing components in timber or steel-framed walls, that run between the top and bottom plates.It is a fundamental element in frame building. The majority non-masonry buildings rely on wall studs, with wood being the most common and least-expensive material used for studs.
The sills are bolted to the masonry or concrete foundation. [6] A beam of PSL lumber installed to replace a load-bearing wall at the first floor of a three-story building. The top plate or ceiling plate is the top of the wall, which sits just below the platform of the next floor (at the ceiling).
8-inch (200 mm) hollow CMU (concrete masonry unit) with 3-inch (76 mm) steel studs, fiberglass insulation and 1 ⁄ 2-inch (13 mm) drywall on each side [35] 72 8-inch (200 mm) concrete block wall, painted, with 1 ⁄ 2 -inch (13 mm) drywall on independent steel stud walls, each side, insulation in cavities
Interior loadbearing walls are framed in the same way as exterior walls. Studs are usually 1 + 1 ⁄ 2 in × 3 + 1 ⁄ 2 in (38 mm × 89 mm) lumber spaced at 16 in (410 mm) on center. This spacing may be changed to 12 or 24 in (300 or 610 mm) depending on the loads supported and the type and thickness of the wall finish used. [12]
Blocking placed as attachment points for cabinets, while doubling as bracing against compression of the studs. Blocking ( dwang , nog, noggin, and nogging) is the use of short pieces of dimensional lumber in wood framed construction to brace longer members or to provide grounds for fixings.
The stud is simply a vertical two-by-four beam in the wall for structural support. And if you lost your stud finder in the moving boxes or simply don’t have one to begin with, these hacks will help.
The infill wall is the supported wall that closes the perimeter of a building constructed with a three-dimensional framework structure (generally made of steel or reinforced concrete). Therefore, the structural frame ensures the bearing function, whereas the infill wall serves to separate inner and outer space, filling up the boxes of the outer ...
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]