Search results
Results from the WOW.Com Content Network
Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts.
NaK was used as the coolant in the first breeder reactor prototype, the Experimental Breeder Reactor-1, in 1951. Sodium and NaK do, however, ignite spontaneously on contact with air and react violently with water, producing hydrogen gas. This was the case at the Monju Nuclear Power Plant in a 1995 accident and fire. Sodium is also the coolant ...
The aim of the template is to show the characteristics of an reactor design (e.g. RBMK) or individual experimental or prototype reactors (e.g. Chicago Pile-1 or Superphénix), but not for individual power plants (e.g. not Chernobyl Nuclear Power Plant)
A nuclear reactor coolant is a coolant in a nuclear reactor used to remove heat from the nuclear reactor core and transfer it to electrical generators and the environment. Frequently, a chain of two coolant loops are used because the primary coolant loop takes on short-term radioactivity from the reactor.
NaK containing 40% to 90% potassium by mass is liquid at room temperature.The eutectic mixture consists of 77% potassium and 23% sodium by mass (NaK-77), and it is a liquid from −12.6 to 785 °C (9.3 to 1,445.0 °F), and has a density of 0.866 g/cm 3 at 21 °C (70 °F) and 0.855 g/cm 3 at 100 °C (212 °F), making it less dense than water. [3]
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more
English: Schematic diagram of an Advanced Gas-cooled Reactor type nuclear reactor 1. Charge tubes 2. Control rods 3. Graphite moderator 4. Fuel assemblies 5. Concrete pressure vessel and radiation shielding 6. Gas circulator 7. Water 8. Water circulator 9. Heat exchanger 10. Steam
Date reactor was shut down, consider using {}. decommission: Date reactor was decommissioned, consider using {} upkeep_cost: annual upkeep/maintenance costs #_of_staff: number of staff #_of_operators: number of operators refuel_time: how often the plant needs to be refueled Technical Information: max_thermal_flux: max_fast_flux: fuel_type: cooling