Search results
Results from the WOW.Com Content Network
The rigging arrangements can influence the applied anchor load, where statically indeterminate systems are not necessarily a design consideration, but can be used in practice. The determination of the loads through the rigging system must be a consideration whilst calculating the load resistant model, refer to the examples shown in Figure 3.
Rigging is both a noun, the equipment, and verb, the action of designing and installing the equipment, in the preparation to move objects. A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide or lift objects such as heavy machinery, structural components, building materials, or large-scale fixtures ...
A precast concrete walled house under construction An example of low-quality precast concrete with exposed dowels, connectors, indications of cracks, and malformations, even during its installation, Barangay Lantic, Carmona, Cavite, Philippines Interior view of the walls, supports, and roof of a precast commercial shop in Williston, North Dakota, US.
Layers in the construction of a mortarless pavement: A.) Subgrade B.) Subbase C.) Base course D.) Paver base E.) Pavers F.) Fine-grained sand. In highway engineering, subbase is the layer of aggregate material laid on the subgrade, on which the base course layer is located. It may be omitted when there will be only foot traffic on the pavement ...
The mechanical advantage is 2, requiring a force of only 50 N to lift the load. A block and tackle is characterized by the use of a single continuous rope to transmit a tension force around one or more pulleys to lift or move a load. Its mechanical advantage is the number of parts of the rope that act on the load. The mechanical advantage of a ...
Rigging of an asymmetrical scaffolding piece: the lifting beam is blue, the load is attached to the beam using grey slings. The lifting beam (also known as traverse, spreader beam) is a steel beam that is attached to the hook of the crane in order to spread the slings from one end of an elongated load (like a wall panel) to another.
A derrick is a lifting device composed at minimum of one guyed mast, as in a gin pole, which may be articulated over a load by adjusting its guys. Most derricks have at least two components, either a guyed mast or self-supporting tower, and a boom hinged at its base to provide articulation, as in a stiffleg derrick. The most basic type of ...
Lifting equipment can be assigned a Working Load Limit (WLL) in the interests of avoiding failure; Working Load Limit is calculated by dividing the Minimum Breaking Load of the equipment by a safety factor. [5] WLL as a concept is not restricted to lifting, being also relevant for mooring ropes. [6]