Search results
Results from the WOW.Com Content Network
The 1996 Rail Financing Framework was a scheme that set out the financing framework of the rail transport system. In the white paper, it was phrased that the financing framework of the rail transport system would eventually be run on the basis of partnership, which the government and its regulatory authority would provide the assets and infrastructure (which remain fully owned by the ...
Most heavy-duty escalators at stations carry passengers up or down at a rate of 0.75 m/s, which is 50% faster than conventional escalators. The Land Transport Authority (LTA) announced a plan to introduce dual speeds to escalators along the North–South and East–West lines, to make it safer for senior citizens using them. As a result, all ...
Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL.
System Map, including lines under construction. This is a list of all stations on the Mass Rapid Transit (MRT) system in Singapore. [1] As of 2024, the Singapore MRT has approximately 242.6 km (150.7 mi) of system length spread across six operational lines, the 19th highest in the world.
Tengah Depot is a future integrated train and bus depot in Tengah, Singapore.At 44.5 ha (110 acres), the at-grade depot will house 100 trains of the Jurong Region line (JRL) fleet and house 600 buses. [1]
As the LTA tried to seek a new contractor, the LTA temporarily appointed McConnell Dowell South East Asia, the contractor for Beauty World station, as the caretaker contractor to carry on tunnelling works. Through engagement with the Ministry of Manpower, the 400 workers who were affected were reassigned or sent home. [16] [17]
On 20 August 2010, the Land Transport Authority (LTA) that Stage 3 of the DTL (DTL3) would terminate at Expo station, where the DTL would interchange with the EWL. [23] [24] Contract 922 for the design and construction of Expo station and the overrun tunnels was awarded to Samsung C&T Corporation for S$211.35million (US$168 million) in May 2011.
Sengkang Depot is a train depot in Sengkang, Singapore operated by SBS Transit. It is the first co-location of facilities for both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT). It maintains the trains for the North East line, Sengkang LRT line, and Punggol LRT line, and houses the control centre of the three lines. [1] [2]