A two-way slab has moment resisting reinforcement in both directions. [24] This may be implemented due to application requirements such as heavy loading, vibration resistance, clearance below the slab, or other factors. However, an important characteristic governing the requirement of a two-way slab is the ratio of the two horizontal lengths.
Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head
[2] Compared to one-way hollow-core slabs, biaxial slabs are more resistant to seismic disturbance. One-way decks are supported by a combination of walls and beams, leading to a relatively rigid structure which increases the risk of progressive collapse. [15]
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
Since the 1950s there have been several attempts to develop theories for arching action in both one and two-way slabs. [5] [6] [7] One of the principal approaches to membrane action was that due to Park [8] which has been used as a basis for many studies into arching action in slabs. Park's approach was based on rigid plastic slab strip theory ...
[2] The T-beam has a big disadvantage compared to an I-beam (with 'Ɪ' shape) because it has no bottom flange with which to deal with tensile forces, applicable for steel section. One way to make a T-beam more efficient structurally is to use an inverted T-beam with a floor slab or bridge deck joining the tops of the beams. Done properly, the ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.