Search results
Results from the WOW.Com Content Network
1. The Certified European Financial Analyst Diploma (CEFA) was set up in 1991. Since its introduction, the CEFA diploma has become one of the most respected and recognized professional credentials in the world, known as the “gold standard” among financial industry professionals in Europe.
Furniture, fixtures, and equipment (or FF&E) (sometimes Furniture, furnishings, and equipment [1] [2]) is an accounting term used in valuing, selling, or liquidating a company or a building. FF&E are movable furniture , fixtures , or other equipment that have no permanent connection to the structure of a building or utilities. [ 3 ]
[citation needed] This element's label is noted by the observer (each group, and each element within a group, is labeled with a single digit). This pair of digits indicates a given element's row and column location in the series table, which in turn defines the spatial frequency of each element, and thus the available resolution of the system.
It is also called a plan which is a measured plane typically projected at the floor height of 4 ft (1.2 m), as opposed to an elevation which is a measured plane projected from the side of a building, along its height, or a section or cross section where a building is cut along an axis to reveal the interior structure.
The moving ranges involved are serially correlated so runs or cycles can show up on the moving average chart that do not indicate real problems in the underlying process. [ 2 ] : 237 In some cases, it may be advisable to use the median of the moving range rather than its average, as when the calculated range data contains a few large values ...
The N 2 chart or N 2 diagram (pronounced "en-two" or "en-squared") is a chart or diagram in the shape of a matrix, representing functional or physical interfaces between system elements. It is used to systematically identify, define, tabulate, design, and analyze functional and physical interfaces.
Some argue that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Here is a list, in no particular order, of the elements of First Fix. Drain runs: must be downhill and straight; Spare conduits: draw strings; Soil pipes; Copper pipes; MVHR (mechanical heat recovery ventilation runs)
Test fixtures can be set up three different ways: in-line, delegate, and implicit. In-line setup creates the test fixture in the same method as the rest of the test. While in-line setup is the simplest test fixture to create, it leads to duplication when multiple tests require the same initial data.