enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Minimum_breaking_strength

    This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor (SF). An example of this would be a chain that has a MBL of 2000 lbf (8.89 kN ) would have a SWL or WLL of 400 lbf (1.78 kN) if a safety factor of 5 (5:1, 5 to 1, or 1/5) is used.

  3. Lift-off oversteer - Wikipedia

    en.wikipedia.org/wiki/Lift-off_oversteer

    Lift-off oversteer (also known as trailing-throttle oversteer, throttle off oversteer, or lift-throttle oversteer) is a form of sudden oversteer.While cornering, a driver who closes the throttle (by lifting a foot off the accelerator, hence the name), usually at a high speed, can cause such sudden deceleration that the vertical load on the tires shifts from rear to front, in a process called ...

  4. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...

  5. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  6. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    F/n = 23 kN per anchor during site lifting (n = 2 lifting anchors) Reference to the load capacity tables provided by the anchor manufacturer is required to make an anchor selection for the specific concrete strengths at the time of lifting. Hence the great of the two calculated anchor capacities required at the concrete strength of the initial ...

  7. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...

  8. Speeds and feeds - Wikipedia

    en.wikipedia.org/wiki/Speeds_and_feeds

    Cutting speed may be defined as the rate at the workpiece surface, irrespective of the machining operation used. A cutting speed for mild steel of 100 ft/min is the same whether it is the speed of the cutter passing over the workpiece, such as in a turning operation, or the speed of the cutter moving past a workpiece, such as in a milling operation.

  9. Block and tackle - Wikipedia

    en.wikipedia.org/wiki/Block_and_tackle

    The mechanical advantage is 2, requiring a force of only 50 N to lift the load. A block and tackle is characterized by the use of a single continuous rope to transmit a tension force around one or more pulleys to lift or move a load. Its mechanical advantage is the number of parts of the rope that act on the load. The mechanical advantage of a ...

  1. Related searches lifting load limit calculator for driving time table worksheet to 12 speed

    lifting equipment regulations pdfforklift lifting regulations
    lifting operations regulations uk