Walls built using big bags instead of smaller traditionally used sandbags were termed the big bag wall, or big bag barrier. In North America, FIBCs are often used in flood prevention as well. An 1850 kg bag (4,070 lbs) has a foot print of at least 3 feet by 3 feet, and a height of almost 4 feet – building a solid wall of sand, 400 regular ...
A standard flexible intermediate bulk container can hold 500 to 1,000 kg (1,100 to 2,200 lb) and manufacturers offer bags with a volume of 285–2,830 litres (10–100 cu ft). [2] Flexible intermediate bulk containers are made of woven polyethylene or polypropylene or other heavy polymers.
Note the 40-ton CAT wheeled dozer at lower left for size comparison A bucket-wheel excavator (BWE) is a large heavy equipment machine used in surface mining . Their primary function is that of a continuous digging machine in large-scale open-pit mining operations, removing thousands of tons of overburden a day.
The Bagger 288 bucket-wheel excavator, beside a Caterpillar Inc. model 824H front end loader for size comparison The excavating head itself is 21.6 m (70 ft 10 in) in diameter and has 18 buckets each holding 6.6 cubic metres (8.6 cu yd) of overburden.
Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil; Unclassified excavation – this is any combination of material types; Excavation may be classified by the purpose: [1]: 13.1, 13.2
Unit loads can be used both for in-process handling and for distribution (receiving, storing, and shipping). Unit load design involves determining the type, size, weight, and configuration of the load; the equipment and method used to handle the load; and the methods of forming (or building) and breaking down the load.
Specific surface area (SSA) is a property of solids defined as the total surface area (SA) of a material per unit mass, [1] (with units of m 2 /kg or m 2 /g). Alternatively, it may be defined as SA per solid or bulk volume [ 2 ] [ 3 ] (units of m 2 /m 3 or m −1 ).
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...