A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. [1] It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded. [2]
The production schedule is a project plan of how the production budget will be spent over a given timescale, for every phase of a business project. [1]The scheduling process starts with the script, which is analysed and broken down, scene by scene, onto a sequence of breakdown sheets, each of which records the resources required to execute the scene.
Scheduling and choosing the actual work to be started in the manufacturing facility" [1] Setting up and delivering production orders to production facilities. [5] In order to develop production plans, the production planner or production planning department needs to work closely together with the marketing department and sales department.
In manufacturing, the purpose of scheduling is to keep due dates of customers and then minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation, utilize maximum resources available and reduce costs.
Material requirements planning (MRP) is a production planning, scheduling, and inventory control system used to manage manufacturing processes. Most MRP systems are software-based, but it is possible to conduct MRP by hand as well. An MRP system is intended to simultaneously meet three objectives:
Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.
Traditional production planning and scheduling systems (such as manufacturing resource planning) use a stepwise procedure to allocate material and production capacity.This approach is simple but cumbersome, and does not readily adapt to changes in demand, resource capacity or material availability.
Specific names for the linear scheduling method have been adopted, such as: [1] Location-based scheduling (the preferred term in the book) Harmonograms; Line-of-balance; Flowline or flow line; Repetitive scheduling method; Vertical production method; Time-location matrix model; Time space scheduling method; Disturbance scheduling