Search results
Results from the WOW.Com Content Network
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
The process of grading a soil is in accordance with either the Unified Soil Classification System or the AASHTO Soil Classification System. The steps in grading a soil are data collection, calculating coefficients of uniformity and curvature, and grading the soil based on the grading criteria given in the used soil classification system. [1]
A site plan or a plot plan is a type of drawing used by architects, landscape architects, urban planners, and engineers which shows existing and proposed conditions for a given area, typically a parcel of land which is to be modified. Sites plan typically show buildings, roads, sidewalks and paths/trails, parking, drainage facilities, sanitary ...
Each member state must produce a plan for each of the river basin districts within its territory. Plans must include: objectives for each water body; reasons for not achieving objectives where relevant; and the programme of actions required to meet the objectives. River Basin Management Plans were published for several member states in December ...
In water supply system drawing there will be hot water piping and cold water piping and hot water return piping also. In drainage system drawings there will be waste piping, Soil piping and vent piping. The set of drawing of each system like water supply, drainage etc is consist of Plans, Riser diagram, Installation details, Legends, Notes.
Stream order is an important aspect of a drainage basin. It is defined as the measure of the position of a stream in the hierarchy of streams. Tributaries are given a number one greater than that of the river or stream into which they discharge. So, for example, all immediate tributaries of the main stem are given the number "2".
Maintaining a systematic record of individual assets (an inventory)—e.g., acquisition cost, original service life, remaining useful life, physical condition, repair and maintenance consistency; Developing a defined program for sustaining the aggregate body of assets through deterioration modeling, planned maintenance, repair, and replacement ...
Scheuffele and Kulshreshtha refer to inventory optimization engines or IO engines, whose function is to analyze inventory data using a holistic approach across the supply network. They note growing interest in their use and application in specific inventory fields, such as plant operations, assembly lines, and within transportation. [1]: 4–7