Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Drainage gradient (DG) is a term in road design, defined as the combined slope due to road surface cross slope (CS) and longitudinal slope (hilliness). Although the term may not be used, the concept is also used in roof design and landscape architecture. If the drainage gradient is too low, rain and melt water drainage will be insufficient.
Site Drawing for Gov. Inst. for Research in Physical Education, Japan 1935. A civil drawing, or site drawing, is a type of technical drawing that shows information about grading, landscaping, or other site details.
d = run Δh = rise l = slope length α = angle of inclination. The grade (US) or gradient (UK) (also called stepth, slope, incline, mainfall, pitch or rise) of a physical feature, landform or constructed line refers to the tangent of the angle of that surface to the horizontal.
A site plan or a plot plan is a type of drawing used by architects, landscape architects, urban planners, and engineers which shows existing and proposed conditions for a given area, typically a parcel of land which is to be modified. Sites plan typically show buildings, roads, sidewalks and paths/trails, parking, drainage facilities, sanitary ...
The examples and perspective in this article deal primarily with the United States and do not represent a worldwide view of the subject. You may improve this article, discuss the issue on the talk page, or create a new article, as appropriate.
In a design, the gradation of the in situ (on site) soil often controls the design and ground water drainage of the site. A poorly graded soil will have better drainage than a well graded soil, [2] if it is not high in clay quality. Soil is graded as either well graded or poorly graded. [3]
Grading and drainage required 3.3 million cubic yards (2,500,000 m³) of earthwork, including over 1 million cubic yards (800,000 m³) of "borrow" material and several 60-inch (1,500 mm) pipes to carry small streams underneath the roadway.