The cross section of a roadway can be considered a representation of what one would see if an excavator dug a trench across a roadway, showing the number of lanes, their widths and cross slopes, as well as the presence or absence of shoulders, curbs, sidewalks, drains, ditches, and other roadway features.
Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch.
Typically on straight road sections, the drainage gradient is at least 1–3% due to the normal cross slope of 1–3%. In curved sections the drainage gradient is higher, and may often reach 5–12% due to superelevated CS that may reach 5–8% in areas with icy roads and up to 12% in areas without icy roads.
Certain issues were resolved in federal court. One issue, whether sidewalks were covered by the ADA, was appealed to the 9th Circuit Court of Appeals, which ruled that sidewalks were a "program" under the ADA and must be made accessible to persons with disabilities. The ruling was later appealed to the U.S. Supreme Court, which refused to hear ...
In civil engineering, cant is often referred to as cross slope or camber. It helps rainwater drain from the road surface. Along straight or gently curved sections, the middle of the road is normally higher than the edges. This is called "normal crown" and helps shed rainwater off the sides of the road. During road works that involve lengths of ...
SIEBEKE LANGE WILBERT a) Für die Anwendung dieser Bestimmungen kommen die Verbandslän- (3) der überein, durch Vermittlung des Internationalen Büros ein Verzeichnis der
Pavement sloping: On straight sections of the highway, the roadway is to have a cross slope of at least 1.5%, and preferably 2% to ensure proper drainage, with up to 2.5% in areas of heavy rainfall. The cross slope of both the left and right shoulders should be between 2% and 6%, but not less than the main lanes.
An 836-pound “cursed” emerald worth nearly $1 billion will be returned to Brazil after 15 years under lock and key in Los Angeles. The 180,000-carat Bahia Emerald was smuggled out of the South ...