enow.com Web Search

  1. Ads

    related to: maximum distance between deck posts and boards needed for construction

Search results

  1. Results from the WOW.Com Content Network
  2. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    The distance between ribs is typically 915 mm (3 ft). [3] The height of the ribs and beams should be 1 ⁄ 25 of the span between columns. [3] The width of the solid area around the column should be 1 ⁄ 8 of the span between columns. Its height should be the same as the ribs. [3]

  3. Cable railing - Wikipedia

    en.wikipedia.org/wiki/Cable_railing

    For 36” posts or 42" posts, 4 feet of spacing (center to center) is recommended to minimize deflection between the cables when pushing a 4" ball in between two cables. To accommodate such standards, railing projects may incorporate 3 ½" or less of spacing between cables taking into account the cable deflection caused by the posts spacing.

  4. Scaffolding - Wikipedia

    en.wikipedia.org/wiki/Scaffolding

    Scaffolding for rehabilitation in Madrid, Spain [1] Scaffolding for renovation on the Virgin Mary statue, Santiago de Chile, Chile.. Scaffolding, also called scaffold or staging, [2] is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other human-made structures.

  5. Tube and clamp scaffold - Wikipedia

    en.wikipedia.org/wiki/Tube_and_clamp_scaffold

    This type of scaffold is generally used where extensive versatility is required. In many countries, it is common in construction. Horizontal tubes and walking decks can be placed at any height along the vertical tube (as permitted by engineering constraints), and vertical tubes, or legs, can be spaced at any distance apart, up to the maximum ...

  6. Open web steel joist - Wikipedia

    en.wikipedia.org/wiki/Open_web_steel_joist

    The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]

  7. Span (engineering) - Wikipedia

    en.wikipedia.org/wiki/Span_(engineering)

    In engineering, span is the distance between two adjacent structural supports (e.g., two piers) of a structural member (e.g., a beam). Span is measured in the horizontal direction either between the faces of the supports (clear span) or between the centers of the bearing surfaces (effective span): [1] A span can be closed by a solid beam or by ...

  1. Ads

    related to: maximum distance between deck posts and boards needed for construction