Search results
Results from the WOW.Com Content Network
Q = (6 ft) × (3.088) × (3 ft) × 1.5 = 96 ft 3 /s. Parshall flume submerged flow example problem: Using the Parshall flume flow equations and Tables 1-3, determine the flow type (free flow or submerged flow) and discharge for a 36-inch flume with an upstream depth, Ha of 1.5 ft and a downstream depth, H b of 1.4 ft.
An event-driven process chain (EPC) is a type of flow chart for business process modeling. EPC can be used to configure enterprise resource planning execution, and for business process improvement. It can be used to control an autonomous workflow instance in work sharing.
The construction industry has suffered from a productivity decline since the 1960s [4] [5] while all other non-farm industries have seen large boosts in productivity. . Proponents of Integrated project delivery argue that problems in contemporary construction, such as buildings that are behind schedule and over budget, are due to adverse relations between the owner, general contractor, and
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Design–build (or design/build, and abbreviated D–B or D/B accordingly), also known as alternative delivery, [1] is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build ...
A post in ground construction, also called earthfast [1] or hole-set posts, is a type of construction in which vertical, roof-bearing timbers, called posts, are in direct contact with the ground. They may be placed into excavated postholes , [ 2 ] driven into the ground, or on sills which are set on the ground without a foundation.
The mock-up serves as both an aesthetic review, but also provides the contractors the opportunity to field test the assembly before full-scale assembly. The mock up may be required to be tested for water tightness and lateral forces. The mock-up panel might be 10 feet wide by 12 feet high, showing the full wall span from floor to floor.
LSM is used mainly in the construction industry to schedule resources in repetitive activities commonly found in highway, pipeline, high-rise building and rail construction projects. These projects are called repetitive or linear projects.