enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Operating reserve - Wikipedia

    en.wikipedia.org/wiki/Operating_reserve

    An idealized representation of the four kinds of reserve power and the time intervals after an unexpected failure that they are in use. [1]In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply.

  3. Losses in electrical systems - Wikipedia

    en.wikipedia.org/wiki/Losses_in_electrical_systems

    In an electrical or electronic circuit or power system part of the energy in play is dissipated by unwanted effects, including energy lost by unwanted heating of resistive components (electricity is also used for the intention of heating, which is not a loss), the effect of parasitic elements (resistance, capacitance, and inductance), skin effect, losses in the windings and cores of ...

  4. Incurred but not reported - Wikipedia

    en.wikipedia.org/wiki/Incurred_but_not_reported

    For example, when a claim is first reported, a $100 payment might be made, and a $900 case reserve might be established, for a total initial reported amount of $1000. However, the claim may later settle for a larger amount, resulting in $2000 of payments from the insurer to the claimant before the claim is closed.

  5. Contingency (electrical grid) - Wikipedia

    en.wikipedia.org/wiki/Contingency_(electrical_grid)

    In an electrical grid, contingency is an unexpected failure of a single principal component (e.g., an electrical generator or a power transmission line) [1] that causes the change of the system state large enough to endanger the grid security. [2]

  6. Resource adequacy - Wikipedia

    en.wikipedia.org/wiki/Resource_adequacy

    Installed reserve margin (IRM) is the amount of the generating capacity in excess of the expected load, calculated to satisfy the loss of load expectation, typically 1 day in 10 years. [2] IRM is used to measure the adequacy of the generation capacity and serves as a guide to evaluate the needs for the capacity changes. [ 3 ]

  7. Power outage - Wikipedia

    en.wikipedia.org/wiki/Power_outage

    Power outages are categorized into three different phenomena, relating to the duration and effect of the outage: A transient fault is a loss of power typically caused by a fault on a power line, e.g. a short circuit or flashover. Power is automatically restored once the fault is cleared. A brownout is a drop in voltage in an electrical power ...

  8. Strategic reserve - Wikipedia

    en.wikipedia.org/wiki/Strategic_reserve

    This time the strategic reserve is defined as a set of power plants or interruptible demand contracts, all controlled by the TSO (transmission system operator), that can be used during temporary lack electricity. The strategic reserve does not necessarily mean a change of available generation capacity, the TSO only takes the control over ...

  9. Load-loss factor - Wikipedia

    en.wikipedia.org/wiki/Load-loss_factor

    Multiple empirical formulae exist that relate the loss factor to the load factor (Dickert et al. in 2009 listed nine [5]). Similarly, the ratio between the average and the peak current is called form coefficient k [ 6 ] or peak responsibility factor k , [ 7 ] its typical value is between 0.2 to 0.8 for distribution networks and 0.8 to 0.95 for ...