enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Rapid bridge replacement - Wikipedia

    en.wikipedia.org/wiki/Rapid_bridge_replacement

    The use of double tees with wide flanges allows the use of fewer beams, which stay in place to form the deck, resulting in a shorter construction time. The first design was introduced in 2008, called "NEXT F" with 4-inch (10 cm) flange thickness requiring a 4-inch (10 cm) topping.

  3. Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more

  4. Embankment (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Embankment_(earthworks)

    An embankment is a raised wall, bank or mound made of earth or stones, that are used to hold back water or carry a roadway. A road , railway line , or canal is normally raised onto an embankment made of compacted soil (typically clay or rock-based) to avoid a change in level required by the terrain , the alternatives being either to have an ...

  5. Earthworks (engineering) - Wikipedia

    en.wikipedia.org/wiki/Earthworks_(engineering)

    Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.

  6. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  7. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...

  8. Hydraulic fill - Wikipedia

    en.wikipedia.org/wiki/Hydraulic_fill

    Hydraulic fill is likely to be the most economic method of construction. Even when the source material lacks sufficient elevation, it can be elevated to the sluice by a dredge pump. In the construction of a hydraulic fill dam, the edges of the dam are defined by low embankments or dykes which are built upward as the fill progresses. The sluices ...

  9. Cut (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Cut_(earthworks)

    Cuts are typically used in road, rail, and canal construction to reduce a route's length and grade. Cut and fill construction uses the spoils from cuts to fill in defiles to create straight routes at steady grades cost-effectively. Cuts are used as alternatives to indirect routes, embankments, or viaducts.