Concrete chipping is a process which requires trained chippers or a robotically-controlled machine with an ultra high pressure water source (20,000 psi) to enter the drums of ready-mix concrete trucks and central mixers to break away the dried concrete along the drums’ walls.
In modern construction, scabbling is a mechanical process of removing a thin layer of concrete from a structure, typically achieved by compressed air powered machines. A typical scabbling machine uses several heads, each with several carbide or steel tips that peck at the concrete. It operates by pounding a number of tipped rods down onto the ...
This testing involves repeatedly dropping a sample of tablets over a fixed time, using a rotating wheel with a baffle. The result is inspected for broken tablets, and the percentage of tablet mass lost through chipping. A typical specification will allow a non-zero percentage of chipping, and zero broken tablets.
The wearing course, also known as a friction course or surface course, is the upper layer in roadway, airfield, and dockyard construction. The term 'surface course' is sometimes used slightly different, to describe very thin surface layers such as chip seal. In rigid pavements the upper layer is a portland cement concrete slab.
Special care must be taken by the contractor to measure and verify dimensions. In new construction, plan dimensions usually are sufficient for ordering many fabricated items such as structural steel or precast concrete. [2] In remodeling and renovation work, it is essential that
The list of construction methods covers the processes and techniques used in the construction process. The construction method is essential for civil engineers; utilizing it appropriately can help to achieve the desired results. The term building refers to the creation of physical structures such as buildings, bridges or railways. One of the ...
Powered machines are built to give the impression that a hand-powered bush hammer has been applied to the concrete. This allows contractors to work on a larger amount of the material without using individual hammers for the project. This saves time and labor costs for those working with the tool.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...