Search results
Results from the WOW.Com Content Network
Casing design for each size of designed pipes is done by calculating the worst conditions that may be faced during drilling and over the producing life of the well. Mechanical properties such as longitudinal tensile strength, and burst and collapse resistance (calculated considering biaxial effects of axial and hoop stresses), must be ...
Different methods of measuring the drill pipe length also have a significant effect on the accuracy of the measurement made. Pipe "strapping" is commonly used to define drill pipe length, where the pipe is measured on the pipe racks using a (steel) measure tape. These results are noted in a tally book, and the drillstring length is hence defined.
Production casing is the final casing string set in a well and usually reaches from the surface to Target Depth (TD). The type of casing used depends upon the different conditions in the well. Commonly, production casing sizes range from 4 + 1 ⁄ 2 in (110 mm) to as large as 9 + 5 ⁄ 8 in (240 mm). It is the last string cemented in a well ...
A tube well is a type of water well in which a long, 100–200 millimetres (3.9–7.9 in)-wide, stainless steel tube or pipe is bored underground. The lower end is fitted with a strainer, and a pump lifts water for irrigation. The required depth of the well depends on the depth of the water table.
Drill pipe is most often considered premium class, which is 80% remaining body wall (RBW). After inspection determines that the RBW is below 80%, the pipe is considered to be Class 2 or "yellow band" pipe. Eventually the drill pipe will be graded as scrap and marked with a red band. Drill pipe is a portion of the overall drill string.
Below the injector is the stripper, which contains rubber pack off elements providing a seal around the tubing to isolate the well's pressure. Below the stripper is the preventer, which provides the ability to cut the coiled tubing pipe and seal the well bore (shear-blind) and hold and seal around the pipe (pipe-slip). Older quad-BOPs have a ...
Well completion is the process of making a well ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required.
Well drilling is the process of drilling a hole in the ground for the extraction of a natural resource such as ground water, brine, natural gas, or petroleum, for the injection of a fluid from surface to a subsurface reservoir or for subsurface formations evaluation or monitoring.