Search results
Results from the WOW.Com Content Network
Different methods of measuring the drill pipe length also have a significant effect on the accuracy of the measurement made. Pipe "strapping" is commonly used to define drill pipe length, where the pipe is measured on the pipe racks using a (steel) measure tape. These results are noted in a tally book, and the drillstring length is hence defined.
Surface casing is the most strictly regulated due to these environmental concerns, which can include regulation of casing depth and cement quality. A typical size of surface casing is 13 + 3 ⁄ 8 inches (340 mm).
A tube well is a type of water well in which a long, 100–200 millimetres (3.9–7.9 in)-wide, stainless steel tube or pipe is bored underground. The lower end is fitted with a strainer, and a pump lifts water for irrigation. The required depth of the well depends on the depth of the water table.
The production liner has the same function as a complete string of production casing. A typical casing arrangement in a well is shown in the diagram below. In this case, the surface casing is set to a depth of about 3,000 ft (910 m). Two intermediate strings are set in this well — a 13 + 3 ⁄ 8 in (340 mm) string and a 9 + 7 ⁄ 8 in (250 mm ...
The pipe segments (called "joints") are typically about 40 feet (12 m) in length, male threaded on each end and connected with short lengths of double-female threaded pipe called couplings. (Some specialty casing is manufactured in one piece with a female thread machined directly into one end.)
Well completion is the process of making a well ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required.
Drill pipe is most often considered premium class, which is 80% remaining body wall (RBW). After inspection determines that the RBW is below 80%, the pipe is considered to be Class 2 or "yellow band" pipe. Eventually the drill pipe will be graded as scrap and marked with a red band. Drill pipe is a portion of the overall drill string.
Drilled wells are usually cased with a factory-made pipe composed of steel or plastic. Drilled wells can access water at much greater depths than dug wells. Two broad classes of well are shallow or unconfined wells completed within the uppermost saturated aquifer at that location, and deep or confined wells, sunk through an impermeable stratum ...