Ads
related to: precast concrete pillars for footings
Search results
Results from the WOW.Com Content Network
Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast beams, and wall panels, floors, roofs, and piles.
Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
A grade beam or grade beam footing is a component of a building's foundation. It consists of a reinforced concrete beam that transmits the load from a bearing wall into spaced foundations such as pile caps or caissons. [1] It is used in conditions where the surface soil's load-bearing capacity is less than the anticipated design loads.
If a concrete filled pipe pile is corroded, most of the load carrying capacity of the pile will remain intact due to the concrete, while it will be lost in an empty pipe pile. The structural capacity of pipe piles is primarily calculated based on steel strength and concrete strength (if filled).
A Franki pile. The Franki piling system (also called pressure-injected footing) is a method used to drive expanded base cast-in-situ concrete (Franki) piles. [1] It was developed by Belgian Engineer Edgard Frankignoul in 1909.
A strap footing connects individual columns with the use of a strap beam. The general purpose of a strap footing is alike to those of a combined footing, where the spacing is possibly limited and/or the columns are adjacent to the property lines. Mat foundation with its concrete undergoing curing.
Modern columns may be constructed out of steel, poured or precast concrete, or brick, left bare or clad in an architectural covering, or veneer. Used to support an arch, an impost, or pier, is the topmost member of a column. The bottom-most part of the arch, called the springing, rests on the impost.
Tilt-up construction requires significant organization and collaboration on the building site. The chronological steps that need to be taken for a tilt-up project are: site evaluation, engineering, footings and floor slabs, forming tilt-up panels, steel placement, embeds and inserts, concrete placement, panel erection and panel finishing.
Ads
related to: precast concrete pillars for footings