Search results
Results from the WOW.Com Content Network
These resistors are non-inductive, which provides benefits when used in voltage pulse reduction and surge protection applications. [2] Carbon composition resistors have higher capability to withstand overload relative to the component's size. [3] Carbon composition resistors are still available, but relatively expensive.
Increasing concrete water content; Increasing concrete porosity; Increasing temperature; Increasing chloride content; Decreasing carbonatation depth; When the electrical resistivity of the concrete is low, the rate of corrosion increases. When the electrical resistivity is high, e.g. in case of dry and carbonated concrete, the rate of corrosion ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
A Möbius resistor is an electrical component made up of two conductive surfaces separated by a dielectric material, twisted 180° and connected to form a Möbius strip. As with the Möbius strip, once the Möbius resistor is connected up in this way it effectively has only one side and one continuous surface. Its connectors are attached at the ...
Angle notation can easily describe leading and lagging current: . [1] In this equation, the value of theta is the important factor for leading and lagging current. As mentioned in the introduction above, leading or lagging current represents a time shift between the current and voltage sine curves, which is represented by the angle by which the curve is ahead or behind of where it would be ...
Since resistors are linear components, it is particularly easy to determine the quiescent operating point of the non-linear device from a graph of its transfer function. The method is as follows: from linear network analysis the output transfer function (that is output voltage against output current) is calculated for the network of resistor(s ...
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
Sulfates (SO 4) in the soil or in groundwater, in sufficient concentration, can react with the Portland cement in concrete causing the formation of expansive products, e.g., ettringite or thaumasite, which can lead to early failure of the structure. The most typical attack of this type is on concrete slabs and foundation walls at grades where ...