Ad
related to: calculate amount of dirt needed- Landscape Designer
Compare local landscape designers.
Visit us today for free estimates.
- Local Lawn Care Pros
Connect With Trusted Lawn care Pros
Fast and Free Bids
- Install Synthetic Grass
Compare local synthetic grass
installation pros. Request a quote.
- Lawn Maintenance & Mowing
Hire lawn maintenance & mowing
experts in your area. Get a quote.
- Landscape Designer
Search results
Results from the WOW.Com Content Network
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut and fill software: view from above. In earthmoving, cut and fill is the process of constructing a railway, road or canal whereby the amount of material from cuts roughly matches the amount of fill needed to make nearby embankments to minimize the amount of construction labor.
The original Proctor test, ASTM D698 / AASHTO T99, uses a 4-inch-diameter (100 mm) by 4.584-inch-high (116.4 mm) mold which holds 1/30 cubic feet of soil, and calls for compaction of three separate lifts of soil using 25 blows by a 5.5 lb hammer falling 12 inches, for a compactive effort of 12,375 ft-lbf/ft 3.
Most soils have a dry bulk density between 1.0 and 1.6 g/cm 3 but organic soil and some porous clays may have a dry bulk density well below 1 g/cm 3. Core samples are taken by pushing a metallic cutting edge into the soil at the desired depth or soil horizon. The soil samples are then oven dried (often at 105 °C) until constant weight.
A percolation test consists of digging one or more holes in the soil of the proposed leach field to a specified depth, presoaking the holes by maintaining a high water level in the holes, then running the test by filling the holes to a specific level and timing the drop of the water level as the water percolates into the surrounding soil.
A sieve analysis (or gradation test) is a practice or procedure used in geology, civil engineering, [1] and chemical engineering [2] to assess the particle size distribution (also called gradation) of a granular material by allowing the material to pass through a series of sieves of progressively smaller mesh size and weighing the amount of material that is stopped by each sieve as a fraction ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
The sample tube is driven a total of 45 cm into the ground and the number of blows needed for the tube to penetrate each 15 cm (6 in) interval up to a depth of 45 cm (18 in) is recorded. The sum of the number of blows required for the second and third 15 cm (6 in) intervals of penetration is termed the "standard penetration resistance" or the ...
The runoff curve number (also called a curve number or simply CN) is an empirical parameter used in hydrology for predicting direct runoff or infiltration from rainfall excess. [1] The curve number method was developed by the USDA Natural Resources Conservation Service , which was formerly called the Soil Conservation Service or SCS — the ...
Ad
related to: calculate amount of dirt needed