This is an accepted version of this page This is the latest accepted revision, reviewed on 9 February 2025. Dam in Yiling District, Hubei, China Dam in Yiling District, Hubei Three Gorges Dam 三峡大坝 The dam in September 2009 Location in Hubei Province Show map of Hubei Three Gorges Dam (China) Show map of China Country China Location Sandouping, Yiling District, Hubei Coordinates 30°49 ...
The Three Gorges (22,500 MW - 32 × 700 MW and 2 × 50 MW) is operated jointly with the much smaller Gezhouba Dam (2,715 MW). The total generating capacity of this two-dam complex is 25,215 MW. The Itaipu on the Brazil–Paraguay border has 20 generator units with overall 14,000 MW of installed capacity. However, the maximum number of ...
Hoover Dam's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. [20] The Itaipu Dam opened in 1984 in South America as the largest, producing 14 GW, but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW.
Upstream of the International Control Dam there are three tunnel intakes which run under Niagara Falls, Ontario, and surface 2 km (1.2 mi) upstream of the Sir Adam Beck Generating Stations. All three tunnel intakes are upstream of the Control Dam, however one of the three tunnels is unseen, under the water, located directly in front of the ...
Bahasa Indonesia: Diagram skematik pembangkit listrik tenaga air (PLTA) English : Schematic diagram of Hydroelectric power plant Español : Recorrido del agua dentro de una central hidroeléctrica
Hoover Dam impounds Lake Mead and is located near Boulder City, Nevada, a municipality originally constructed for workers on the construction project, about 30 mi (48 km) southeast of Las Vegas, Nevada. The dam's generators provide power for public and private utilities in Nevada, Arizona, and California.
The dam is 181 m (594 ft) high, 2,335 m (7,661 ft) long and 115 m (377 ft) in width. Power is generated by 32 turbines rated at 700 MW, and two turbines rated 50 MW, which are used to power the facility itself. Construction of this dam commenced in 1994, and was completed in 2012, nearly two decades after it started.
A weir was constructed downstream of the intake and just above the falls, to help raise the river above the intake so water could be delivered to the plant. Four Pelton turbines with 1.5 MW Westinghouse generators were initially installed. [8] The first operational generator was online and began to transmit power to Seattle on July 31, 1899.