enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Space Shuttle design process - Wikipedia

    en.wikipedia.org/wiki/Space_Shuttle_design_process

    Astronautix Space Shuttle article; NASA: The Space Shuttle Decision; INTRODUCTION TO FUTURE LAUNCH VEHICLE PLANS [1963–2001], M. Lindroos; 10 Space Shuttles which never flew (Lockheed Starclipper, Chrysler SERV, Phase B Shuttles, Rockwell C-1057, Shuttle C, Air Launched Sortie Vehicle (ALSV), Hermes, Buran, Shuttle II, Lockheed Martin ...

  3. Studied Space Shuttle designs - Wikipedia

    en.wikipedia.org/wiki/Studied_Space_Shuttle_designs

    The 5-segment SRB, which would have required little change to the current shuttle infrastructure, would have allowed the space shuttle to carry an additional 20,000 lb (9,100 kg) of payload in a 51.6°-inclination orbit, eliminate the dangerous "Return-to-Launch Site" (RTLS) and "Trans-Oceanic Abort" (TAL) modes, and, by using a so-called "dog ...

  4. Space Shuttle program - Wikipedia

    en.wikipedia.org/wiki/Space_Shuttle_program

    The stalled plans for a U.S. space station evolved into the International Space Station and were formally initiated in 1983 by President Ronald Reagan, but the ISS suffered from long delays, design changes and cost over-runs [3] and forced the service life of the Space Shuttle to be extended several times until 2011 when it was finally retired ...

  5. Space Shuttle - Wikipedia

    en.wikipedia.org/wiki/Space_Shuttle

    The Space Shuttle external tank (ET) carried the propellant for the Space Shuttle Main Engines, and connected the orbiter vehicle with the solid rocket boosters. The ET was 47 m (153.8 ft) tall and 8.4 m (27.6 ft) in diameter, and contained separate tanks for liquid oxygen and liquid hydrogen.

  6. List of Space Shuttle missions - Wikipedia

    en.wikipedia.org/wiki/List_of_Space_Shuttle_missions

    The Space Shuttle was a partially reusable low Earth orbital spacecraft system operated by NASA (the National Aeronautics and Space Administration). Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. [ 1 ]

  7. Skylon (spacecraft) - Wikipedia

    en.wikipedia.org/wiki/Skylon_(spacecraft)

    Skylon has its origins within a previous space development programme for an envisioned single-stage-to-orbit (SSTO) spaceplane, known as HOTOL. [14] In 1982, when work commenced on the HOTOL by several British companies, there was significant international interest to develop and produce viable reusable launch systems, perhaps the most high-profile of these being the NASA-operated Space Shuttle.

  8. AOL Mail

    mail.aol.com/?icid=aol.com-nav

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Launch Control Center - Wikipedia

    en.wikipedia.org/wiki/Launch_Control_Center

    The LPS Coordinator monitors and oversees the LPS System; specifically, the desired launch rate, Space Shuttle stacking (assembly), and all safety requirements. This is made possible by the Launch Processing System , or LPS — a highly automated, computer-controlled system that oversees the entire checkout and launch process.