enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Janney coupler - Wikipedia

    en.wikipedia.org/wiki/Janney_coupler

    It automatically locks the couplers on cars or locomotives together without a rail worker having to get between the cars, and replaced the link and pin coupler, which was a major cause of railroad worker injuries and deaths. The locking pin that ensures Janney couplers remain fastened together is withdrawn manually by a worker using the "cut ...

  3. Railway coupling - Wikipedia

    en.wikipedia.org/wiki/Railway_coupling

    On straight track, the link and pin coupler is used. Since the vertical curve between the straight track sections and the ramp between the lock chambers has a very small radius, the difference in height would be too great for a link and pin coupler, so the locomotives must be pushed through these sections uncoupled by using the side buffers.

  4. Automatic block signaling - Wikipedia

    en.wikipedia.org/wiki/Automatic_block_signaling

    Automatic block signaling (ABS), spelled automatic block signalling or called track circuit block (TCB [1]) in the UK, is a railroad communications system that consists of a series of signals that divide a railway line into a series of sections, called blocks. The system controls the movement of trains between the blocks using automatic signals.

  5. Automatic train control - Wikipedia

    en.wikipedia.org/wiki/Automatic_train_control

    D-ATC indicator used on the E233 series trains. The digital ATC system uses the track circuits to detect the presence of a train in the section and then transmits digital data from wayside equipment to the train on the track circuit numbers, the number of clear sections (track circuits) to the next train ahead, and the platform that the train will arrive at.

  6. Signalling block system - Wikipedia

    en.wikipedia.org/wiki/Signalling_block_system

    The basic principle is that a track is broken up into a series of sections or "blocks". Only one train may occupy a block at a time, [citation needed] and the blocks are sized to allow a train to stop within them. [1] That ensures that a train always has time to stop before getting dangerously close to another train on the same line.

  7. Interlocking - Wikipedia

    en.wikipedia.org/wiki/Interlocking

    Railway interlocking is of British origin, where numerous patents were granted. In June 1856, John Saxby received the first patent for interlocking switches and signals. [2] [3]: 23–24 In 1868, Saxby (of Saxby & Farmer) [4] was awarded a patent for what is known today in North America as “preliminary latch locking”.

  8. Tightlock coupling - Wikipedia

    en.wikipedia.org/wiki/Tightlock_coupling

    On a standard-gauge railway, the nominal mounting height for the coupler (rail top to coupler center) is 33 inches (838 mm), with a 34 + 1 ⁄ 2 ± 1 inch (876 ± 25 mm) maximum height on empty cars and 31 + 1 ⁄ 2 ± 1 inch (800 ± 25 mm) minimum height on loaded cars.

  9. Railway signalling - Wikipedia

    en.wikipedia.org/wiki/Railway_signalling

    Track circuits can automatically detect some types of track defect such as a broken rail. In the event of power restoration after a power failure, an axle counted section is left in an undetermined state until a train has passed through the affected section. A track circuited section immediately detects the presence of a train in section.