  2. Demand factor - Wikipedia

    en.wikipedia.org/wiki/Demand_factor

    This is the peak in the load profile divided by the full load of the device. Example: If a residence has equipment which could draw 6,000 W when all equipment was drawing a full load, drew a maximum of 3,000 W in a specified time, then the demand factor = 3,000 W / 6,000 W = 0.5

  3. Peak demand - Wikipedia

    en.wikipedia.org/wiki/Peak_demand

    The highest demand during each month or even a single 15 to 30 minute period of highest use in the previous year may be used to calculate charges. [3] The renewable energy transition will include considerations for peak demand. [4] Economic growth of the state is inversely associated with peak load. [5]

  4. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  5. Maximum demand indicator - Wikipedia

    en.wikipedia.org/wiki/Maximum_demand_indicator

    Maximum Demand Indicator (MDI) is an instrument for measuring the maximum amount [clarification needed] of electrical energy required by a specific consumer during a given period of time. [1] MDI instruments record the base load requirement of electrical energy .

  6. Demand load - Wikipedia

    en.wikipedia.org/wiki/Demand_load

    The demand load is the sum of the operational load (including any tactical load) and nonoperational demand loads. It is determined by applying the proper demand factor to each of the connected loads and a diversity factor to the sum total.

  7. Diversity factor - Wikipedia

    en.wikipedia.org/wiki/Diversity_factor

    The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.

  8. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy , such as wind, the sun or ...

  9. Load management - Wikipedia

    en.wikipedia.org/wiki/Load_management

    Capacity factor is a measure of the output of a power plant compared to the maximum output it could produce. Capacity factor is often defined as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher load factor is advantageous because a power plant may be less efficient at low load factors ...