The change request management process in systems engineering is the process of requesting, determining attainability, planning, implementing, and evaluating of changes to a system. Its main goals are to support the processing and traceability of changes to an interconnected set of factors.
A change request is declarative, i.e. it states what needs to be accomplished, but leaves out how the change should be carried out. Important elements of a change request are an ID, the customer (ID), the deadline (if applicable), an indication whether the change is required or optional, the change type (often chosen from a domain-specific ontology) and a change abstract, which is a piece of ...
An engineering change order (ECO), also called an engineering change notice (ECN), engineering change (EC), or engineering release notice(ERN), is an artifact used to implement changes to components or end products. The ECO is utilized to control and coordinate changes to product designs that evolve over time.
A document that shows the detailed description of the change. Usually this document is called "Engineering Change Notice", but it may be covered by the customer PO or any other engineering authorization. Engineering Approval This approval is usually the Engineering trial with production parts performed at the customer plant.
The authority of the Change Control Board may vary from project to project (see e.g. Consensus-based decision making), but decisions reached by the Change Control Board are often accepted as final and binding. A typical Change Control Board might consist of the development manager, the test lead, and a product manager.
If the change control request is approved to move forward, the delivery team will execute the solution through a small-scale development process in test or development environments. This allows the delivery team an opportunity to design and make incremental changes, with unit and/or regression testing .
A change order is work that is added to or deleted from the original scope of work of a contract. Depending on the magnitude of the change, it may or may not alter the original contract amount and/or completion date. A change order may force a new project to handle significant changes to the current project. [2]
engineering Bill of Material EBU engine build-up EC engineering control (also E/C) ECAM electronic centralised aircraft monitor ECET end of civil evening twilight: ECR Engineering Change Request ECS Environmental control system ECU Engine Control Unit (=EEC) EDR engineering data record EDTO extended diversion time operations: EEC