Search results
Results from the WOW.Com Content Network
The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India.The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north.
South End Circle is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Basavanagudi area of Bengaluru, India. It was opened to the public on 18 June 2017.
After the inauguration, the Purple Line was complete and the Namma Metro became the second longest metro system in India (76.95 km) after Delhi Metro. Each line of Namma Metro is identified by a specific color. [4] The system uses rolling stock of standard gauge and has a combination of elevated, underground and at-grade lines. The metro is ...
Construction of the yellow line, a new line from Rashtreeya Vidyalaya Road to Bommasandra in 3 packages began post awarding of tenders in November 2017. The first package (6.418 km / 3.988 mi) was a stretch from Bommasandra to Hosa Road station, including depot entry line to Hebbagodi depot and five Metro stations.
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India. The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1] R.V. Road station is the terminal station within the city, with an interchange with the Green Line.
The metro service runs from 5 am and 12 am daily. The end-to-end travel time on a Purple Line train is 82 minutes. [66] From 7 November 2016, Purple Line trains began running at an interval of every 4 minutes between 9:10 am and 9:58 am to handle rising passenger traffic during morning peak hour. [67]
The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A (Central Silk Board to Krishnarajapura) and Phase-2B (Krishnarajapura to Airport). Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022.
Yelachenahalli (formerly known as Puttenahalli) is an elevated metro station on the North-South corridor of the Green Line of Namma Metro located on Kanakapura Road between Yelechenahalli and Konanakunte suburbs in Bengaluru, India. It was opened to the public on 18 June 2017. [3]