Every decision in the product development process affects cost: design is typically considered to account for 70–80% of the final cost of a project such as an engineering project [1] or the construction of a building. [2] In the public sector, cost reduction programs can be used where income is reduced or to reduce debt levels. [3]
Kaizen costing is a cost reduction system used a product's design has been completed and it is in production. [1] Business professor Yasuhiro Monden [2] defines kaizen costing as . The maintenance of present cost levels for products currently being manufactured via systematic efforts to achieve the desired cost level. [citation needed]
Design-to-Cost (DTC), as part of cost management techniques, describes a systematic approach to controlling the costs of product development and manufacturing.The basic idea is that costs are designed "into the product", even from the earliest concept decisions on and are difficult to remove later.
Standard Costing is a technique of Cost Accounting to compare the actual costs with standard costs (that are pre-defined) with the help of Variance Analysis. It is used to understand the variations of product costs in manufacturing. [6] Standard costing allocates fixed costs incurred in an accounting period to the goods produced during that period.
Some practitioners of PCM are mostly concerned with the cost of the product up until the point that the customer takes delivery (e.g. manufacturing costs + logistics costs) or the total cost of acquisition. They seek to launch products that meet profit targets at launch rather than reducing the costs of a product after production.
Design to cost and design to standards serves cost reduction in production operations, or respectively supply chain operations. Except for luxury goods or brands (e.g., Swarovski crystals, Haute couture fashion, etc.), most goods, even exclusive products, rely on cost reduction, if these are mass produced.
Value engineering can lead to the substitution of lower-cost materials, as with the exterior cladding that accelerated the Grenfell Tower fire in London. [1] [2]Value engineering (VE) is a systematic analysis of the functions of various components and materials to lower the cost of goods, products and services with a tolerable loss of performance or functionality.
Cost engineering is "the engineering practice devoted to the management of project cost, involving such activities as estimating, cost control, cost forecasting, investment appraisal and risk analysis". [1] "Cost Engineers budget, plan and monitor investment projects.