In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
Control joints must have adequate depth and not exceed maximum spacing for them to be effective. Typical specifications for a four-inch-thick slab are: [8] 25% depth of material; spacing at 24 × to 36 × of slab depth (some specification call for a maximum of 30 ×) special care for inside corners
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
A discontinuity may exist as a single feature (e.g. fault, isolated joint or fracture) and in some circumstances, a discontinuity is treated as a single discontinuity although it belongs to a discontinuity set, in particular if the spacing is very wide compared to the size of the engineering application or to the size of the geotechnical unit.
A building joint is a junction where building elements meet without applying a static load from one element to another. When one or more of these vertical or horizontal elements that meet are required by the local building code to have a fire-resistance rating, the resulting opening that makes up the joint must be firestopped in order to restore the required compartmentalisation.
Attempts have been made to increase the safety of bridges with pin and hanger assemblies by adding some form of redundancy to the assembly. Retrofits that add redundancy to pin and hanger assemblies include adding a "catcher's mitt"—a short steel beam attached to the bottom of the cantilevered girder that extends out beneath the suspended girder to "catch" the suspended girder should ...