Search results
Results from the WOW.Com Content Network
Glulam brace with plates used for connections Glulam frame of a roof structure. Glued laminated timber, commonly referred to as glulam, is a type of structural engineered wood product constituted by layers of dimensional lumber bonded together with durable, moisture-resistant structural adhesives so that all of the grain runs parallel to the longitudinal axis.
Products include wood composite decking and railing, exterior cladding products, vinyl fencing, OEM PVC profiles, wood doors and door-frames, and vinyl sheet piling. The group also has several service units in the roofing, security gate systems, and steel I-beam markets.
GRC (Glass fibre-reinforced concrete) ceramic consists of high-strength, alkali-resistant glass fibre embedded in a concrete & ceramic matrix. [1] In this form, both fibres and matrix retain their physical and chemical identities, while offering a synergistic combination of properties that cannot be achieved with either of the components acting alone.
Precast parking structure showing an interior column, girders, and double-tee structural floors. The two gray circles are covers to close the lifting anchor holes. Precast concrete building components and site amenities are used architecturally as fireplace mantels, cladding, trim products, accessories and curtain walls.
Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a
The two major advantages of formwork systems, compared to traditional timber formwork, are speed of construction (modular systems pin, clip, or screw together quickly) and lower life-cycle costs (barring major force, the frame is almost indestructible, while the covering if made of wood; may have to be replaced after a few - or a few dozen ...
The wall transfers lateral wind loads upon it to the main building structure through connections at floors or columns of the building. Curtain walls may be designed as "systems" integrating frame, wall panel, and weatherproofing materials. Steel frames have largely given way to aluminum extrusions.
The building was constructed for approximately $89 million and the main materials used were glass, steel, and precast concrete panels. [2] The buildings that make up Nationwide Plaza are: One Nationwide Plaza, completed in 1977; 280 Plaza (also known as Two Nationwide), completed in 1981; Three Nationwide Plaza, completed in 1988