Search results
Results from the WOW.Com Content Network
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Short forms, up to 60 cm high, are placed on both sides of the wall to serve as a guide for the stone work. The stones are placed inside the forms with the good faces against the form work. Concrete is poured in behind the rocks. Rebar is added for strength, to make a wall that is approximately half reinforced concrete and half stonework. The ...
The Canberra monocrete homes are built on brick piers and surrounding brick footing, and all of the walls are of monocrete construction including interior ones. They are precast with steel windows and door frames set directly into the concrete. Steel plates in the ceiling space bolt the individual wall panels together.
Forms are prepared with steel rebar and styrofoam. The concrete mix is created at 5,000 psi and bonds directly to the foam insulation. The panels are then finished with the application of a vibrating screen to assist flow and fill potential voids, while creating greater surface consistency.
With multiple forms, the entire floor of a building can be done in a single pour. Tunnel forms require sufficient space exterior to the building for the entire form to be slipped out and hoisted up to the next level. A section of the walls is left uncasted to remove the forms. Typically castings are done with a frequency of 4 days.
Discover the latest breaking news in the U.S. and around the world — politics, weather, entertainment, lifestyle, finance, sports and much more.
Formwork for beams takes the form of a box that is supported and propped in the correct position and level. The removal time for the formwork will vary with air temperature, humidity and consequent curing rate. Typical striking times are as follows (using air temperature of 7-16 °C): Form work. Beam sides: 9–12 hours. Beam soffits: 8–14 days.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!