The mostly used turbines are Pelton and Cross-flow types. Most of the MHP turbines are manufactured locally. The first turbine manufactured at the Balaju Yantra Shala Pvt. Ltd. (established 1960) was a 5 kW propeller turbine for the first MHP of Nepal in 1962. Kathmandu Metal Industries Pvt. Ltd., Nepal YantraShala Energy, Nepal Hydro & Electric Pvt. Ltd., Nepal Machine and Steel Structure, a
Pharping Hydro Power Project (Nepali: फर्पिङ लघु जलविद्युत् परियोजना) is the first hydro-power project of Nepal and second of South Asia. It is situated in Kathmandu district. [1] In 2010, it was declared a Living Museum by government of Nepal and was open for public. [2]
Sundarijal Small Hydropower Station (Nepali: सुन्दरिजल सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Kathmandu District of Nepal. The flow from Sundarijal River is used to generate 640 kW electricity and annual energy generation is 4.77 GWh.
Molun Khola Small Hydropower Station (Nepali: मोलुन खोला सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Okhaldhunga District of Nepal. The flow from Molun River is used to generate 7 MW electricity.
Dwari Khola Small Hydropower Station (Nepali: द्वारी खोला सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Naumule, Dailekh District of Nepal. [1] The flow from Dwari River is used to generate 3.75 MW electricity. The gross head is 450.40 m and design flow is 1.58 ...
Jiri Khola Small Hydropower Station (Nepali: जिरी खोला सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Dolakha District of Nepal. The flow from Jiri River is used to generate 2.4 MW electricity. The plant is owned and developed by Bojini Company (P.) Ltd, an IPP of ...
Gandaki Hydropower Development Co. P. Ltd Ridi Khola Hydropower Station: Palpa District: 2.4 2066-07-10 BS Ridi Hydropower Development Co P Ltd Lower Chaku Khola Hydropower Station: Sindhupalchok District: 1.8 2070-04-24 BS Laughing Buddha Power Nepal Pvt. Ltd Sipring Khola Hydropower Station: Dolakha District: 10 2069-10-03 BS Synergy Power ...
This is only project in Nepal to utilize pressurized Glass Fibre reinforced Plastic (GRP) pipe for flow conduction. The plant has two units with Turgo turbine (2 *1250 KW). The power is evacuated via 33kVA transmission line to switch-yard of Sunkoshi Hydropower Station (9MW) The plant was completely submerged by 2014 Sunkoshi blockage. [3]