The installed electrical capacity and production of Sri Lanka by sources, from 2000 to 2018. Sri Lanka's electricity demand is currently met by nine thermal power stations, fifteen large hydroelectric power stations, and fifteen wind farms, with a smaller share from small hydro facilities and other renewables such as solar.
Denawaka Ganga Mini Hydro Power [1] [2] Project is a run of river mini hydro power project located in Ratnapura, Sri Lanka. The install capacity of the project is 7.2 MW and the annual generation is 25GWh. The generated energy is fed into the national electric grid of Sri Lanka.
The Uma Oya Hydropower Complex (also internally called Uma Oya Multipurpose Development Project or UOMDP) is an irrigation and hydroelectric complex in the Badulla District of Sri Lanka. Early assessments of the project date back to 1989, when the first studies was conducted by the country's Central Engineering and Consultancy Bureau.
The 220kV transmission line of the Upper Kotmale Hydro-power Project connects the power station located at Niyamgamdora, Kotmale, to the national grid via Kotmale switch yard located in Atabage, Gampola. The line consists of 45 towers and has a length of 15.5 km. The double circuit transmission line has a capacity of 220 MW per circuit.
Moragolla is the last major Hydro Power Plant in Mahaweli Ganga Hydro Power Scheme. The project site is located on the upper reaches of the Mahaweli Ganga in the Central Highlands, approximately 22 km south of Kandy City, close to the village of Ulapane in Kandy district and about 130 km north-east of Colombo.
The Broadlands Dam (also known as the Broadlands Hydropower Project by the developers) is a 35 MW run-of-the-river hydroelectric complex currently under construction in Kitulgala, Sri Lanka. The project is expected to be completed in 2020, and will consist of two dams, and a power station downstream.
The following page lists most dams in Sri Lanka. Most of these dams are governed by the Mahaweli Authority, while the Ceylon Electricity Board operates dams used for hydroelectric power generation. Hydroelectric dams, including small hydros, account for nearly half of the installed power capacity of Sri Lanka.
Moragolla Dam is the last major Hydro Power Plant in Mahaweli Ganga Hydro Power Scheme. [1] The project site is located on the upper reaches of the Mahaweli Ganga in the Central Highlands, approximately 22 km south of Kandy City close to the village of Ulapane in the Kandy district and about 130 km North-East of Colombo.