Search results
Results from the WOW.Com Content Network
A plumbing drawing, a type of technical drawing, shows the system of piping for fresh water going into the building and waste going out, both solid and liquid. It also includes fuel gas drawings. Mainly plumbing drawing consist of water supply system drawings, drainage system drawings, irrigation system drawings, storm water system drawings.
1. Center line, the central axis of a feature. 2. Class, for example, "paint per spec XYZ revision C type 1 class 2" may be abbreviated as "paint per spec XYZ REV C TY 1 CL 2" or even in some cases "paint per spec XYZ-C-1-2". (The latter practice is not uncommon but is cryptic for workers with minimal training and experience. The first two ...
Various scales may be used for different drawings in a set. For example, a floor plan may be drawn at 1:50 (1:48 or 1 ⁄ 4 ″ = 1′ 0″) whereas a detailed view may be drawn at 1:25 (1:24 or 1 ⁄ 2 ″ = 1′ 0″). Site plans are often drawn at 1:200 or 1:100. Scale is a nuanced subject in the use of engineering drawings.
Floor plans use standard symbols to indicate features such as doors. This symbol shows the location of the door in a wall and which way the door opens. A floor plan is not a top view or bird's-eye view; it is a measured drawing to scale of the layout of a floor in a building.
Whereas in a conventional hand drawn technical drawing, if a mistake is found, or a modification is required, a new drawing must be made from scratch, the 2D CAD system allows a copy of the original to be modified, saving considerable time. 2D CAD systems can be used to create plans for large projects such as buildings and aircraft but provide ...
It has almost entirely been superseded by digital computer-aided construction drawings. The term blueprint continues to be used informally to refer to any floor plan [2] (and by analogy, any type of plan). [3] [4] Practising engineers, architects, and drafters often call them "drawings", "prints", or "plans". [5]
The labels used on pipes must be positioned visibly in the vicinity of the most hazardous points, such as valves and joints; at both sides of bulkheads and floor penetrations; and at reasonable intervals. The regulations do not specify a specific marking system, but BS EN ISO 1710 Graphical symbols — Safety colours and safety signs is often used.
[1] MEP specifically encompasses the in-depth design and selection of these systems, as opposed to a tradesperson simply installing equipment. For example, a plumber may select and install a commercial hot water system based on common practice and regulatory codes. A team of MEP engineers will research the best design according to the ...