enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. BS 5930 - Wikipedia

    en.wikipedia.org/wiki/BS_5930

    Excavations, boreholes probing and geophysical surveying are used to investigate the ground. Intrusive investigations should be sited, spaced and backfilled with care. The GI should give sufficient information to make good decisions on design, construction material selection. The condition and accessibility on site may affect the equipment used.

  3. Core recovery parameters - Wikipedia

    en.wikipedia.org/wiki/Core_recovery_parameters

    It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core. In this respect pieces of core that are not hard and sound should not be counted though they are 100 mm in length.

  4. Borehole - Wikipedia

    en.wikipedia.org/wiki/Borehole

    A borehole is a narrow shaft bored in the ground, either vertically or horizontally. A borehole may be constructed for many different purposes, including the extraction of water ( drilled water well and tube well ), other liquids (such as petroleum ), or gases (such as natural gas ).

  5. Outdoor wood-fired boiler - Wikipedia

    en.wikipedia.org/wiki/Outdoor_wood-fired_boiler

    The outdoor wood boiler is a variant on the indoor wood, oil or gas boiler. An outdoor wood boiler or outdoor wood stove is a unit about 4-6 feet wide and around 10 feet long. It is made up of four main parts- the firebox, which can be either round or square, the water jacket, the heat exchanger, and the weather proof housing.

  6. Nested wells - Wikipedia

    en.wikipedia.org/wiki/Nested_wells

    Sand packs must be installed at the screen depths and seals in the borehole are constructed between the sand packs. Nested wells are different from well clusters in that the latter consists of a cluster of wells where tubes or pipes are constructed in separate, individual boreholes that are drilled and completed at different depths.

  7. Deep hole drilling - Wikipedia

    en.wikipedia.org/wiki/Deep_hole_drilling

    Due to this design features, a certain amount of the cutting forces during the process is transferred via the guide pads to the bore hole wall. These force components at the tool head are supported at the produced borehole wall and thus guide the tool in the bore hole itself.

  8. Drill cuttings - Wikipedia

    en.wikipedia.org/wiki/Drill_cuttings

    Drill cuttings [1] are broken bits of solid material removed from a borehole drilled by rotary, percussion, or auger methods and brought to the surface in the drilling mud. Boreholes drilled in this way include oil or gas wells, water wells, and holes drilled for geotechnical investigations or mineral exploration. [2]

  9. Bottom hole assembly - Wikipedia

    en.wikipedia.org/wiki/Bottom_hole_assembly

    Rotary assemblies [2] are commonly used where formations are predictable and the rig economics are an issue. In such an assembly the weight of the drill collars gives the BHA the tendency to sag or flex to the low side of the hole, collar stiffness length and stabiliser diameter and placement are engineered as a means of controlling the flex of the BHA.