Search results
Results from the WOW.Com Content Network
The most common plumbing fixtures are: Bathtubs; Bidets; Channel drains; Drinking fountains; Showers; Sinks; Tap (connections for water hoses) . Tapware - an industry term for that sub-category of plumbing fixtures consisting of tap valves, also called water taps (British English) or faucets (American English), and their accessories, such as water spouts and shower heads.
A barb (or hose barb), which connects flexible hose or tubing to pipes, typically has a male-threaded end which mates with female threads. The other end of the fitting has a single- or multi-barbed tube—a long tapered cone with ridges, which is inserted into a flexible hose.
A fibre washer (which expands when wet, aiding the seal) is used between the connector and the tap tail. Tap tails are normally 1 ⁄ 2 " or 12 mm in diameter for sinks and 3 ⁄ 4 " or 19 mm for baths, although continental Europe sometimes uses a 3 ⁄ 8 " (still imperial) size. The same connection method is used for a ballcock.
Aerator assembly diagram. Aeration occurs in two basic steps: [2] [5] Air is drawn into the water stream, breaking the stream into a flow of tiny droplets mixed with air. The mixture of air and water passes through a screen, further mixing the air and water and evenly spreading out the resulting stream.
This article related to water transport is a stub. You can help Wikipedia by expanding it.
"Rub-a-dub-dub" is an English language nursery rhyme first published at the end of the 18th century in volume two of Hook's Christmas Box [1] under the title "Dub a dub dub" rather than "Rub a dub dub". It has a Roud
Filters use sieving, adsorption, ion exchanges, biofilms and other processes to remove unwanted substances from water. Unlike a sieve or screen, a filter can potentially remove particles much smaller than the holes through which its water passes, such as nitrates or germs like Cryptosporidium.
Later that day a replacement blowout preventer was placed on the well. [15] On September 4 at 6:54 p.m. CDT the failed blowout preventer reached the surface of the water and at 9:16 p.m. CDT it was placed in a special container on board the vessel Helix Q4000. [15]