Hussain Sagar Thermal Power Station was a historic thermal power plant that was located in Hyderabad, Telangana on the banks of Hussain Sagar. It was India's first thermal power station , opened in 1920 by the erstwhile seventh Nizam of Hyderabad . [ 1 ]
The majority of the world's thermal power stations are driven by steam turbines, gas turbines, or a combination of the two. The efficiency of a thermal power station is determined by how effectively it converts heat energy into electrical energy, specifically the ratio of saleable electricity to the heating value of the fuel used.
Thermal power is the largest source of power in India. There are different types of thermal power plants based on the fuel that are used to generate the steam such as coal, gas, and diesel, natural gas. About 71% of electricity consumed in India is generated by thermal power plants. [8]
Anpara Thermal Power Station is located at Anpara in Sonbhadra district in the Indian state of Uttar Pradesh, about 180 km (110 mi) from Varanasi on the Varanasi - Shakti Nagar route. It has a total power-generation capacity of 3850 MW using 9 units.
Sasan UMPP is India's largest integrated power generation and coal mine project with 3,960 MW power plant and 20 MT per year coal mining capacity. It is presently the 4th largest electricity generation power plant in India after NTPC Vindhyachal (4,760 MW), Mundra Thermal Power (4,620 MW) and Mundra UMPP (4,000 MW).
The power plant is one of the four major power plants in Vidarbha – a power surplus region of India. [3] The power station began operations in 1974 and is one of the nine active power stations operated by Maharashtra State Power Generation Company Limited (Prajot), a subsidiary of Government of Maharashtra owned Maharashtra State Electricity ...
Nashik Thermal Power Station has an installed capacity of 140*2+210*3=910 MW. The first unit was commissioned in 1970. the cost of unit including civil works was Rs 56.5 crores. and the second unit also commissioned with the same cost under the first stage. the second stage consists of three units of 210 MW each was commissioned in the later years.
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...