Search results
Results from the WOW.Com Content Network
A worker checking that well about an alarm was also killed. [158] October, 1998 – During heavy rainfall, the roof and sides of a Koch 50,000 barrel (2,100,000 gallon) above-ground storage tank buckled, discharging approximate 24,700 gallons of crude oil into Marcelinas Creek, which is a tributary of the San Antonio River.
Systems installed in well casing to read formation pressure directly, suspended systems, and systems built in coil (continuous) tubing are also available. The data that PDGs provide are useful to reservoir engineers in determining the quantities of oil or gas contained below the Earth's surface in an oil or gas reservoir and also which method ...
WST – well seismic tool (checkshot [citation needed]) WSTL – well site test log; WSU – well service unit; wt – wall thickness; WT – well test; WTI – West Texas Intermediate benchmark crude; WTR – water; WUT – water up to; WV – wing valve (from a christmas tree [citation needed]) WVS – well velocity survey; WWS – wire ...
Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers.
A leak appearing within an analytic region (a rule added to the camera) is immediately analyzed for its attributes, including thermal temperature, size, and behaviour (e.g. spraying, pooling, spilling). When a leak is determined to be valid based on set parameters, an alarm notification with leak video is generated and sent to a monitoring station.
An MFL tool is known as an "intelligent" or "smart" inspection pig because it contains electronics and collects data real-time while traveling through the pipeline. Sophisticated electronics on board allow this tool to accurately detect anomalies as small as 1 mm 2, which can include dimensions of a pipeline wall as well as its depth and ...
The Soviets lowered a specially made 30 kiloton nuclear physics package into a 6-kilometre (20,000 ft) borehole drilled 25 to 50 metres (82 to 164 ft) away from the original (rapidly leaking) well. A nuclear explosive was deemed necessary because conventional explosives both lacked the necessary power and would also require a great deal more ...
A USBR soil scientist advances a Giddings Probe direct push soil sampler.. Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions; this type of investigation is ...