enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Minimum_breaking_strength

    This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor (SF). An example of this would be a chain that has a MBL of 2000 lbf (8.89 kN ) would have a SWL or WLL of 400 lbf (1.78 kN) if a safety factor of 5 (5:1, 5 to 1, or 1/5) is used.

  3. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    F/n = 23 kN per anchor during site lifting (n = 2 lifting anchors) Reference to the load capacity tables provided by the anchor manufacturer is required to make an anchor selection for the specific concrete strengths at the time of lifting. Hence the great of the two calculated anchor capacities required at the concrete strength of the initial ...

  4. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  5. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...

  6. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...

  7. Block and tackle - Wikipedia

    en.wikipedia.org/wiki/Block_and_tackle

    The mechanical advantage is 2, requiring a force of only 50 N to lift the load. A block and tackle is characterized by the use of a single continuous rope to transmit a tension force around one or more pulleys to lift or move a load. Its mechanical advantage is the number of parts of the rope that act on the load. The mechanical advantage of a ...

  8. Drivers' working hours - Wikipedia

    en.wikipedia.org/wiki/Drivers'_working_hours

    The cumulative driving time without taking a break must not exceed 4.5 hours. Before surpassing 4.5 hours of cumulated driving time, the driver must take a break period of at least 45 minutes. However, this can be split into 2 breaks, the first being at least 15 minutes, and the second being at least 30 minutes in length. The daily driving time ...

  9. Safe Load Indicator - Wikipedia

    en.wikipedia.org/wiki/Safe_Load_Indicator

    A Safe Load Indicator (SLI) or an Automatic Safe Load Indicator (ASLI) is a device which is installed on mobile or portal cranes to alert the operator if the lift is exceeding the safe operating range of the machinery. [1] In some cases, the device will physically lock the machinery in circumstances it determines to be unsafe.