Search results
Results from the WOW.Com Content Network
Primary oil well control is the process which maintains a hydrostatic pressure in the wellbore greater than the pressure of the fluids in the formation being drilled, but less than formation fracture pressure. It uses the mud weight to provide sufficient pressure to prevent an influx of formation fluid into the wellbore. If hydrostatic pressure ...
In the oil and gas industry, reservoir modeling involves the construction of a computer model of a petroleum reservoir, for the purposes of improving estimation of reserves and making decisions regarding the development of the field, predicting future production, placing additional wells and evaluating alternative reservoir management scenarios.
the drilling and operating companies well control policies. For workover or completion operations, other methods are often used. Bullheading is a common way to kill a well during workovers and completions operations but is not often used while drilling. Reverse circulation is another kill method used for workovers that are not used for drilling ...
The primary functions of a blowout preventer system are to: Confine well fluid to the wellbore; Provide means to add fluid to the wellbore; Allow controlled volumes of fluid to be withdrawn from the wellbore. Additionally, and in performing those primary functions, blowout preventer systems are used to: Regulate and monitor wellbore pressure;
Mud pump (#4) is a reciprocal type of pump used to circulate drilling fluid through the system. Mud tank (#1) is often called mud pits and stores drilling fluid until it is required down the wellbore. Setback (#17) is a part of the drill floor (#21) where the stands of drill pipe are stood upright. It is typically made of a metal frame ...
During the design stage, the diagram also provides the basis for the development of system control schemes, allowing for further safety and operational investigations, such as a Hazard and operability study (HAZOP). To do this, it is critical to demonstrate the physical sequence of equipment and systems, as well as how these systems connect.
The primary purpose of a wellhead is to provide the suspension point and pressure seals for the casing strings that run from the bottom of the hole sections to the surface pressure control equipment. [1] While drilling the oil well, surface pressure control is provided by a blowout preventer (BOP).
The system diagram for representing control loops is a Piping and instrumentation diagram. Commonly used control systems include programmable logic controller (PLC), Distributed Control System (DCS) or SCADA. Example of level control system of a continuous stirred-tank reactor. The flow control into the tank would be cascaded off the level control.