enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Hydrodemolition - Wikipedia

    en.wikipedia.org/wiki/Hydrodemolition

    Robotic Hydrodemolition in Ystad, Sweden. Hydrodemolition of concrete exposing the rebar.. Hydrodemolition (also known as hydro demolition, hydroblasting, hydro blasting, hydromilling, waterblasting, and waterjetting) is a concrete removal technique which utilizes high-pressure water, often containing an abrasive material, to remove deteriorated and sound concrete as well as asphalt and grout.

  3. Pavement milling - Wikipedia

    en.wikipedia.org/wiki/Pavement_milling

    Pavement milling (cold planing, asphalt milling, or profiling) is the process of removing at least part of the surface of a paved area such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooth the surface to a full depth removal.

  4. Hydromill trench cutter - Wikipedia

    en.wikipedia.org/wiki/Hydromill_trench_cutter

    Hydromill trench cutter with two cutter wheels at bottom. The hydromill trench cutter is a specialized type of construction equipment designed to dig the narrow but deep trenches used in the casting of slurry walls.

  5. Watermill - Wikipedia

    en.wikipedia.org/wiki/Watermill

    Watermill of Braine-le-Château, Belgium (12th century) Interior of the Lyme Regis watermill, UK (14th century). A watermill or water mill is a mill that uses hydropower.It is a structure that uses a water wheel or water turbine to drive a mechanical process such as milling (grinding), rolling, or hammering.

  6. Diamond grinding of pavement - Wikipedia

    en.wikipedia.org/wiki/Diamond_grinding_of_pavement

    Diamond grinding is a pavement preservation technique that corrects a variety of surface imperfections on both concrete and asphalt concrete pavements. Most often utilized on concrete pavement, diamond grinding is typically performed in conjunction with other concrete pavement preservation (CPP) techniques such as road slab stabilization, full- and partial-depth repair, dowel bar retrofit ...

  7. Hydroforming - Wikipedia

    en.wikipedia.org/wiki/Hydroforming

    Forming with the fluid in direct contact with the part can be done either with a male solid punch (this version is sometimes called hydro-mechanical deep drawing [6]) or with a female solid die. In hydro-mechanical deep drawing, a work piece is placed on a draw ring (blank holder) over a male punch then a hydraulic chamber surrounds the work ...

  8. Taum Sauk Hydroelectric Power Station - Wikipedia

    en.wikipedia.org/wiki/Taum_Sauk_Hydroelectric...

    The upper reservoir can hold about 1.5 billion US gallons (4,600 acre-feet; 5.7 million cubic metres) of water behind a wall nearly 100 feet (30 m) tall. [12] It sits 760 feet (230 m) above the 450 MW hydroelectric plant, which gives it a greater head than that of Hoover Dam.

  9. Hydrophobic concrete - Wikipedia

    en.wikipedia.org/wiki/Hydrophobic_concrete

    Hydrophobic concrete can be used in the same applications as regular concrete, most often where regular concrete is dangerous to repair or the cost of structural damage would be highly detrimental. Tunnel work is a major application of hydrophobic concrete as underground repairs are difficult and costly. [ 8 ]