Search results
Results from the WOW.Com Content Network
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Once a particular depth of trench is reached, a reinforcing cage is lowered into the slurry-filled pit and the pit is filled with concrete from the bottom up using tremie pipes. The heavier concrete displaces the bentonite slurry, which is pumped out, filtered, and stored in tanks for use in the next wall segment, or it is recycled.
The top of the tremie is above water and open, and the bottom end is kept below the surface of the poured concrete. triangular profile A triangular dive profile is one in which, after a descent at constant rate, and a short bottom time at maximum depth, the diver maintains a constant, slow ascent to the surface or first decompression stop.
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more
The bubble moves water through the pipe sucking debris from the lower end and depositing it from the upper end of the pipe. Ejected debris can be either cast off (as in simply removing overburden ) or collected in a mesh cage for inspection (as more often is the case in nautical archaeology).
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Donate; Pages for logged out editors learn more
Barge outfitted with Cranes is towed into position. Marine construction is the process of building structures in or adjacent to large bodies of water, usually the sea. These structures can be built for a variety of purposes, including transportation, energy production, and recreation.
United States Navy Seabees use a screed (noun) to screed (verb) wet concrete. The form-work acts as screed rails.. In the United States, a person called a concrete finisher performs the process of screeding, which is the process of cutting off excess wet concrete to bring the top surface of a slab to the proper grade and smoothness.