Search results
Results from the WOW.Com Content Network
The common installation method for laminate flooring is a floating installation, which means the floor connects to each other to form interlocked flooring system and is not attached to the sub-floor which means it is free to "float" over a variety of sub-floors. This includes existing flooring like ceramic tile and hardwood floors.
Improper installation can result in peaking, in which adjacent boards form an inverted V shape projecting from the floor, or gaps, in which two adjacent boards are separated from each other. Installation of laminate flooring – note underlay to allow for contraction, expansion, and moisture control and method for squaring and distancing from wall.
A solid ground floor consists of a layer of concrete, which in the case of a domestic building will be the surface layer brought up to ground floor level with hardcore filling under it. The advantage of a solid ground floor is the elimination of dry rot and other problems normally associated with hollow joisted floors.
Glulam brace with plates used for connections Glulam frame of a roof structure. Glued laminated timber, commonly referred to as glulam, is a type of structural engineered wood product constituted by layers of dimensional lumber bonded together with durable, moisture-resistant structural adhesives so that all of the grain runs parallel to the longitudinal axis.
Large self-supporting wooden roof built for Expo 2000 in Hanover, Germany. Engineered wood, also called mass timber, composite wood, man-made wood, or manufactured board, includes a range of derivative wood products which are manufactured by binding or fixing the strands, particles, fibres, or veneers or boards of wood, together with adhesives, or other methods of fixation [1] to form ...
A slurry wall is a civil engineering technique used to build reinforced concrete walls in areas of soft earth close to open water, or with a high groundwater table. [1] This technique is typically used to build diaphragm (water-blocking) walls surrounding tunnels and open cuts, and to lay foundations .
Applying the adhesive is most often done in one of two ways: a through-feed process or side-by-side nozzles. In the through-feed process extruder heads distribute parallel threads of adhesive along the piece of lumber in an airtight system to avoid air gaps in the glue that could affect bonding strength.
Concrete floor polished with 1800 grit. Polished concrete is a multi-step process where a concrete floor is mechanically ground, honed and polished with bonded abrasives in order to achieve a desired level of sheen or gloss. The Concrete Polishing Process. Concrete polishing begins with floor preparation. During this process, the floor is ...