enow.com Web Search

  1. Ad

    related to: calculate concrete pressure on formwork ceiling plan drawing

Search results

  1. Results from the WOW.Com Content Network
  2. Controlled permeability formwork - Wikipedia

    en.wikipedia.org/wiki/Controlled_Permeability...

    In-situ evaluation of silane treated concrete cast using Zemdrain formwork liner at Dock street bridge, Belfast. Internal report to Du pont De Nemours, Luxembourg, Report No - TAS 139, June, 1992, p. 8, (Unpublished). Reddi, S.A. Permeable formwork for impermeable concrete. Indian Concrete Journal, January, 1992, pp. 31–35.

  3. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  4. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    Like other concrete formwork, the forms are filled with concrete in 1-foot to 4-foot high "lifts" to manage the concrete pressure and reduce the risk of blowouts. After the concrete has cured, the forms are left in place permanently to provide a variety of benefits, depending on materials used: Thermal insulation; Soundproofing

  5. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  6. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    A list, usually tabular and often on the drawing (if not accompanying the drawing on a separate sheet), listing the parts needed in an assembly, including subparts, standard parts, and hardware. There is no consistently enforced distinction between an L/M, a BoM, or a P/L. PLM: product lifecycle management; plant lifecycle management: See also ...

  7. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    Waffle slabs are composed by intricate formwork, and may be more expensive than other types of slabs, but depending on the project and the quantity of concrete needed it may be cheaper to build. There are two types of waffle slab system: One way waffle slab system; Two way waffle slab system

  8. Construction Specifications Institute - Wikipedia

    en.wikipedia.org/wiki/Construction...

    In November 2010, CSI acquired Building Systems Design (BSD) to help advance software tools for specifications development and communication of building information across the building team. [ 2 ] [ 3 ] BSD is a software firm that is a leading developer of commercial master specifications and construction cost estimating software.

  9. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    Lifting design is influenced by the steel / concrete interaction of the specific anchor selected. Different load cases are considered by the lifting design engineer, such as anchor susceptibility to edge distance, placement sensitivity, and anchor capacity at the specific concrete strength at time of lift.

  1. Ad

    related to: calculate concrete pressure on formwork ceiling plan drawing