Search results
Results from the WOW.Com Content Network
Water falls towards a parapet gutter, a valley gutter or an eaves gutter. [12] When two pitched roofs meet at an angle, they also form a pitched valley gutter: the join is sealed with valley flashing. Parapet gutters and valley gutters discharge into internal rainwater pipes or directly into external down pipes at the end of the run. [12]
A box gutter, internal gutter, parallel gutter, or trough gutter is a rain gutter on a roof usually rectangular in shape; it may be lined with EPDM rubber, metal, asphalt, or roofing felt, and may be concealed behind a parapet or the eaves, or in a roof valley. [1] [2] Box gutters are essentially placed between parallel surfaces, as in a valley ...
The proposed alternate compounded the loads on the bolts, which resulted in the skywalks collapsing on July 17, 1981. 114 people were killed. This example illustrates the importance of submittal review. Submittals in construction management can include: shop drawings, material data, samples, and product data.
A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
The states' contractors already had a significant investment in the Jersey-shape casting forms and it would cost them money to change the profiles of the forms. The F-shape and the Jersey-shape have the same slopes, but the distance from the ground to the slope break point of the F-shape is 255 millimetres (10.0 in), which is 75 millimetres (3. ...
The issuance of a drawing from the engineering/design activity to the production activity. In other words, the event when a draft becomes a completed, official document. A stamp on the drawing saying "ISSUED" documents that RTP has occurred. RTV: room-temperature vulcanizing; return to vendor: 1. RTV sealants, a way to seal joints. 2.
Cold mix asphalt is often used on lower-volume rural roads, where hot mix asphalt would cool too much on the long trip from the asphalt plant to the construction site. [18] An asphalt concrete surface will generally be constructed for high-volume primary highways having an average annual daily traffic load greater than 1,200 vehicles per day. [19]
The pavement condition index (PCI) is a numerical index between 0 and 100, which is used to indicate the general condition of a pavement section.The PCI is widely used in transportation civil engineering [1] and asset management, and many municipalities use it to measure the performance of their road infrastructure and their levels of service. [2]