Search results
Results from the WOW.Com Content Network
The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations, starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23 km (13.19 mi), with most of the it being elevated.
AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. [1] [failed verification] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.
This is a list of all stations of the Ahmedabad Metro, a rapid transit system serving Ahmedabad, India. Ahmedabad Metro is the 12th metro system in India. It was built and is operated by the Gujarat Metro Rail Corporation Limited. Its first section was inaugurated on 4 March 2019 [1] and opened to the public on 6 March 2019, with the East-West ...
The nearest metro station will be AEC metro station of Ahmedabad Metro's Line 2 (Red Line), located at the same distance like the Sabarmati Power House bus station, because the bus station lies directly under the metro station. It will also be connected directly to the high-speed railway station through the elevated walkway originating from the ...
The special purpose vehicle company, Metro Link Express for Gandhinagar and Ahmedabad Company Ltd, later renamed Gujarat Metro Rail Corporation Limited (GMRC) in 2018, was established by Government of Gujarat on 4 February 2010 with ₹ 202 crore (US$23 million). Later in 2014, it was decided that the Central Government will own 50% of the company.
North-South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017. The Phase-1 (North-South Corridor) of Ahmedabad Metro consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The line is completely elevated.
It will extend the north–south corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar (23.838 km (14.812 mi)) with a branch line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total 28.26 km (17.56 mi)-long elevated corridor with 22 ...
Kalupur Railway metro station of Red Line (Line 2) of Ahmedabad Metro. The station is being built just next to Kalupur Railway metro station of Red Line (Line 2) of Ahmedabad Metro, towards west, located just a few hundred metres away from the entrance level of the station. The concourse level of the station will be integrated with skywalks and ...