enow.com Web Search

  1. Ad

    related to: maximum flow calculator for concrete floor construction process

Search results

  1. Results from the WOW.Com Content Network
  2. Flow table test - Wikipedia

    en.wikipedia.org/wiki/Flow_table_test

    The flow table test or slump-flow test is a method to determine consistency of fresh concrete. Flow table test is also used to identify transportable moisture limit of solid bulk cargoes. [ 1 ] It is used primarily for assessing concrete that is too fluid (workable) to be measured using the slump test , because the concrete will not retain its ...

  3. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]

  4. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  5. Filigree concrete - Wikipedia

    en.wikipedia.org/wiki/Filigree_concrete

    The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place ...

  6. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]

  7. Double tee - Wikipedia

    en.wikipedia.org/wiki/Double_tee

    The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping. In double-tee structures, the top concrete is usually made at the factory as an integral part of the precast double tee structure.

  8. Concrete slump test - Wikipedia

    en.wikipedia.org/wiki/Concrete_slump_test

    The test is carried out using a metal mould in the shape of a conical frustum known as a slump cone or Abrams cone, that is open at both ends and has attached handles.The tool typically has an internal diameter of 100 millimetres (3.9 in) at the top and of 200 millimetres (7.9 in) at the bottom with a height of 305 millimetres (12.0 in).The cone is placed on a hard non-absorbent surface.

  9. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  1. Ad

    related to: maximum flow calculator for concrete floor construction process