enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Minimum_breaking_strength

    This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor (SF). An example of this would be a chain that has a MBL of 2000 lbf (8.89 kN ) would have a SWL or WLL of 400 lbf (1.78 kN) if a safety factor of 5 (5:1, 5 to 1, or 1/5) is used.

  4. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    The configuration (size, position and quantity) of this reinforcement should be supplemented to the element reinforcement design to ensure for adequate capacity of the lifting design. Lifting design is influenced by the steel / concrete interaction of the specific anchor selected. Different load cases are considered by the lifting design ...

  5. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  6. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...

  7. Eurocode 1: Actions on structures - Wikipedia

    en.wikipedia.org/wiki/Eurocode_1:_Actions_on...

    EN 1991-1-1 gives design guidance and actions for the structural design of buildings and civil engineering works including some geotechnical aspects for the following subjects: Densities of construction materials and stored materials. Self-weight of construction works. Imposed loads for buildings.

  8. Construction (Design and Management) Regulations 2007

    en.wikipedia.org/wiki/Construction_(Design_and...

    Construction phase plans (CPP or CPHP) must contain health and safety management systems and arrangements, and risk assessments and method statements for initial work activities. On non-notifiable projects involving demolition or high risk levels, a written plan, approximating the construction phase plan is recommended.

  9. Construction site safety - Wikipedia

    en.wikipedia.org/wiki/Construction_site_safety

    Another prevention method on the construction site is to provide a scaffold that is rigid and sufficient to carry its own weight plus four times the maximum intended load without settling or displacement. [64] Ways to prevent injuries and improve safety include: Management safety; Integrate safety as a part of the job